LGA is a major source of economic activity for the Borough of Queens as well as the New York City region. LGA employs approximately 10,000 people, and contributes more than $13.6 billion in economic activity to the NY/NJ metropolitan region, generating about 103,000 local jobs and $4.9 billion in annual wages and salaries.
Central Terminal Building Background
The Central Terminal Building opened to the public in 1964 with a design capacity of 8 million annual air passengers (enplaned and deplaned). Modernized and expanded to approximately 835,000 square feet of floor space in the 1990s, the six-block long terminal consists of a four-story central section, two three-story wings, and four concourses that can accommodate up to 35 aircraft gate positions.
The CTB faces a wide variety of challenges to both airside and landside operations. There are inadequacies in several areas of the CTB and its support facilities. The CTB parking garage (P2) is approaching the end of its useful life, and will require significant investment simply to maintain a state of good repair. The CTB's frontage roads do not meet industry design standards and are overly congested during peak periods. Its aircraft ramp constrains aircraft movement, resulting in delays, higher costs, and inefficiencies. The CTB itself suffers from severe spatial constraints; its design prevents airlines from using more modern, fuel efficient and environmentally friendly planes. Today's fleet of larger aircraft deliver passenger loads that are well in excess of the CTB's original design, with deficiencies throughout the concourses in hold room capacity, circulation, concessions, and rest rooms. Certain infrastructure is at the end of its useful life and cannot adequately serve current and future airport demands.
LGA Redevelopment Program
LGA is undergoing an extensive capital redevelopment program in an effort to provide world-class airport facilities for passengers and airlines alike. The Program is expected to include the demolition of the existing CTB and associated infrastructure and the construction of a new 1.3 million square foot, 35 gate terminal building; a new aeronautical ramp; frontage roads that will serve the new terminal; a new central heating and refrigeration plant; and other utilities and site improvements. These project elements will be constructed, operated, maintained and partially financed by a private developer that will be selected by the Port Authority via its procurement process. In addition, the developer will design and construct new airport roadway systems, utilities in the Central Terminal Area, and the West Parking Garage. In 2013, roughly 13 million passengers passed through Terminal B, also a record.
The Port Authority will also undertake certain supporting projects that have independent utility and will support airlines and passengers across the entire airport including the construction of utilities; the demolition of Hangars 2 and 4; the construction of the new East Parking Garage; and the installation of runway safety enhancements.